Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2846
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGavaskar, Pradnya (16CEM05)-
dc.contributor.authorMagar, Rajendra-
dc.contributor.authorHonnutagi, Abdul Razak-
dc.date.accessioned2019-03-12T08:15:11Z-
dc.date.available2019-03-12T08:15:11Z-
dc.date.issued2018-02-
dc.identifier.issn2393 - 8021-
dc.identifier.urihttp://www.aiktcdspace.org:8080/jspui/handle/123456789/2846-
dc.descriptionKeywords: construction management; cost control; cost performance; schedule performance; earned value management method;weibull analysis .en_US
dc.description.abstractIn construction projects, construction project managers monitor and control the project performance to ensure the project is under control. The Earned Value Management (EVM) method is a tool that integrates three critical elements of project management: scope management, cost management, time management. EVM is traditi onally used to monitor and control the project performance by using cost and schedule indices. EVM is widely used to forecast project cost and time at completion. However, the application of EVM is limited due to poor accuracy in forecasting cost and sched ule performance. Conventional EVM has inability to address the uncertainties as well as their causes and effects. Recently, many EVM - based cost and schedule performance forecasting methods were introduced by many researchers. This study describes the major aspects of EVM and useful statistical techniques to enhance the effective application of EVM in project management. Further it includes the overview of a statistical approach to refine and improve the performance of conventional EVM by introduction of Wei bull Analysis. This can be used in addition with EVM to give probabilistic approach to evaluate cost and schedule performance in construction projecten_US
dc.description.sponsorshipConference on Advances in Civil Engineering 2018(CACE-2018) Thakur College of Engineering and Technology, Thakuren_US
dc.language.isoen_USen_US
dc.publisherInternational Advanced Research Journal in Science, Engineering and Technologyen_US
dc.relation.ispartofseriesVolume 5;Issue 3-
dc.subjectStaff Publication - SoETen_US
dc.subjectStaff Publication - CEen_US
dc.subjectStudent Publication - CEMen_US
dc.titleReview on weibull analysis for performance evaluation in construction projecten_US
dc.typeArticleen_US
Appears in Collections:Research - Dept. of Civil Engg.

Files in This Item:
File Description SizeFormat 
aiktcDspace2846.pdf252.92 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.