Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2849
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShaikh, Mohammed Ayyaz Mohammed Qasim (15CEM13)-
dc.contributor.authorMagar, Rajendra-
dc.contributor.authorMahajan, Girish-
dc.date.accessioned2019-03-12T09:03:19Z-
dc.date.available2019-03-12T09:03:19Z-
dc.date.issued2018-02-
dc.identifier.issn2393-8021-
dc.identifier.urihttp://www.aiktcdspace.org:8080/jspui/handle/123456789/2849-
dc.descriptionConference on Advances in Civil Engineering 2018 (CACE-2018) |Thakur College of Engineering and Technology, Thakuren_US
dc.description.abstractThree important parameters such as time, cost and quality are essentially necessary for successful completion of construction projects. Quality is the real parameter that is responsible for safety and overall health of construction projects. Maximum defect occurs during execution phase only due to non-compliance of desired specifications. It is observed that, on many sites, executors are not aware about quality control checklist and its significance. This is the reason why defects occur in even newly constructed structures. To overcome this, Android application, have been developed for Quality Control Indicator by using the Six-sigma process. The Six Sigma processes that are generally used in manufacturing plants, however its implementation has started in the construction industry. In the Android application, quality control checklist prepared by a construction company had taken for reference. Project authorities can apply quality control checklist on the activities and can give their remarks about the performance of particular construction activity such as Satisfactory (S ), Unsatisfactory (US ) and Not Available (NA). If any defect occurs in the activity and if it is not mitigated by site engineer or supervisor then the higher authority may take appropriate corrective action. By using this, Quality Control Indicator Application time required for lengthy conventional quality control process can be considerably reduced. Through this application, six sigma levels for particular performance are obtained immediately as well as cause s and effects of particular defect is also recorded in the application. Hence, this study covers the entire process of quality control indicators and android application for obtaining six sigma levels of various activities of the project. This study focusses on use to quality control indicator for various construction activities. QC Indicators indicates the quality status of the activity for facilitating the application of remedial measures in order to improve quality.en_US
dc.language.isoen_USen_US
dc.publisherInternational Advanced Research Journal in Science, Engineering and Technologyen_US
dc.relation.ispartofseriesVol.5;Issue 3-
dc.subjectStaff Publication - SoETen_US
dc.subjectStaff Publication - CEen_US
dc.subjectStudent Publication - CEMen_US
dc.titleQuality improvement by using quality control indicators in high rise buildingen_US
dc.typeArticleen_US
Appears in Collections:Research - Dept. of Civil Engg.

Files in This Item:
File Description SizeFormat 
aiktcDspace2849.pdf315.66 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.