Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/3089
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShaikh, Rizwan
dc.contributor.authorRaeen Saddam, Md. Shaukat (15ME91)
dc.contributor.authorSiddiqui, Rameez (15ME113)
dc.contributor.authorRaza Mohd., Nadeem Aslam (15ME93)
dc.contributor.authorShaikh, Mustaq Ibrahim (15ME104 )
dc.date.accessioned2019-07-22T10:56:41Z
dc.date.available2019-07-22T10:56:41Z
dc.date.issued2019-05
dc.identifier.urihttp://www.aiktcdspace.org:8080/jspui/handle/123456789/3089
dc.descriptionSubmitted in partial fulfillment for the requirement of the degree of Bachelor of Mechanical Engineering.en_US
dc.description.abstractThe air brake is the standard train brake used by railways all over the world, and to test the braking system single car test rig is used. It is based on the simple physical properties of compressed air. The Rake Test Rig performs the braking test at Twin Pipe Braking system of coaches. Rake Test Rig used has two pressure gauges that are Feed pipe gauge and Brake pipe gauge. The existing test rig used at workshop has many numbers of conventional joints, complex construction and its weight. The improvisation and Redesigning in test rig construction is implemented to overcome the existing problems and the brake testing procedure is also studied. The improvised design and construction made the test rig more accurate than existing and problems were found to be completely resolved..en_US
dc.language.isoenen_US
dc.publisherAIKTCen_US
dc.relation.ispartofseriesAccession # PE0554;
dc.subjectProject Report - MEen_US
dc.titleImprovisation and fabrication of rake test rig used for air brake leakage testing in railwaysen_US
dc.typeProject Reporten_US
Appears in Collections:Mechanical Engineering - Project Reports

Files in This Item:
File Description SizeFormat 
PE0554.pdf2 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.