Planning and scheduling of a high rise building using primavera

Show simple item record

dc.contributor.author Jadhav, Umesh
dc.contributor.author Khan, Muhammad (12CE32)
dc.contributor.author Khokar, Abdul (12CE39)
dc.contributor.author Khan, Mubashir (12CE42)
dc.date.accessioned 2016-10-01T15:08:18Z
dc.date.available 2016-10-01T15:08:18Z
dc.date.issued 2016-05
dc.identifier.uri http://www.aiktcdspace.org:8080/jspui/handle/123456789/1807
dc.description Keywords: Planning, Scheduling, High Rise Buildings, Primavera, Critical Path, Gantt Charts, en_US
dc.description.abstract With the onset of High Rise Buildings in metropolitan cities, planning and scheduling has become a major concept to be considered for a smooth execution of construction works. Oracle’s Primavera P6 is an effective tool for determining an ideal schedule for construction activities. This project serves as a perfect reference frame for scheduling different High Rise Buildings. All the important steps like creating an EPS, creating a WBS, linking of activities according to their interdependence and availability of resources, reduction of float values, and determination of Critical Path are clearly exhibited in this report. en_US
dc.language.iso en_US en_US
dc.publisher AIKTC en_US
dc.subject Project Report - CE en_US
dc.title Planning and scheduling of a high rise building using primavera en_US
dc.type Project Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account