Abstract:
Abstract : There are various draw backs in conventional method used for planning, scheduling & monitoring projects in
Architecture, Engineering, and Construction (AEC)industry which fails to provide a clear view of the on-going actual work
at the project site. Building Information Modeling (BIM) is Single file concept collaborating various database of the
project at one platform. It is a data repository for building design, construction & maintenance information combined in
one convenient model to share with all the stakeholders. 3D visualizations allow customers to see historic preservation &
site context with respect to the new project. This paper focuses the perspective of a planning engineer with respect to
Conventional method & B I M and gives a methodology to prepare a 4D simulated model of a Gr. (Stilt) + 16th Floor
residential building taking 4th dimension as time.