Improvisation and fabrication of rake test rig used for air brake leakage testing in railways

Show simple item record

dc.contributor.author Shaikh, Rizwan
dc.contributor.author Raeen Saddam, Md. Shaukat (15ME91)
dc.contributor.author Siddiqui, Rameez (15ME113)
dc.contributor.author Raza Mohd., Nadeem Aslam (15ME93)
dc.contributor.author Shaikh, Mustaq Ibrahim (15ME104 )
dc.date.accessioned 2019-07-22T10:56:41Z
dc.date.available 2019-07-22T10:56:41Z
dc.date.issued 2019-05
dc.identifier.uri http://www.aiktcdspace.org:8080/jspui/handle/123456789/3089
dc.description Submitted in partial fulfillment for the requirement of the degree of Bachelor of Mechanical Engineering. en_US
dc.description.abstract The air brake is the standard train brake used by railways all over the world, and to test the braking system single car test rig is used. It is based on the simple physical properties of compressed air. The Rake Test Rig performs the braking test at Twin Pipe Braking system of coaches. Rake Test Rig used has two pressure gauges that are Feed pipe gauge and Brake pipe gauge. The existing test rig used at workshop has many numbers of conventional joints, complex construction and its weight. The improvisation and Redesigning in test rig construction is implemented to overcome the existing problems and the brake testing procedure is also studied. The improvised design and construction made the test rig more accurate than existing and problems were found to be completely resolved.. en_US
dc.language.iso en en_US
dc.publisher AIKTC en_US
dc.relation.ispartofseries Accession # PE0554;
dc.subject Project Report - ME en_US
dc.title Improvisation and fabrication of rake test rig used for air brake leakage testing in railways en_US
dc.type Project Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account