Abstract:
The air brake is the standard train brake used by railways all over the world, and to
test the braking system single car test rig is used. It is based on the simple physical
properties of compressed air. The Rake Test Rig performs the braking test at Twin
Pipe Braking system of coaches. Rake Test Rig used has two pressure gauges that are
Feed pipe gauge and Brake pipe gauge. The existing test rig used at workshop has
many numbers of conventional joints, complex construction and its weight. The improvisation
and Redesigning in test rig construction is implemented to overcome the
existing problems and the brake testing procedure is also studied. The improvised
design and construction made the test rig more accurate than existing and problems
were found to be completely resolved..
Keywords:
Testing procedure, Brake pipe, Feed pipe, resdigned and improvised RTR.