dc.contributor.author |
Gandhi, Asif |
|
dc.contributor.author |
Mulla, Mohammed Rehan Aziz ( 16DME163) |
|
dc.contributor.author |
Shaikh, Watique ( 16DME179) |
|
dc.contributor.author |
Sandhi, Taha ( 16DME167) |
|
dc.contributor.author |
Mullaji, Daniyal ( 16DME164) |
|
dc.date.accessioned |
2019-07-30T07:05:27Z |
|
dc.date.available |
2019-07-30T07:05:27Z |
|
dc.date.issued |
2019-05 |
|
dc.identifier.uri |
http://www.aiktcdspace.org:8080/jspui/handle/123456789/3198 |
|
dc.description.abstract |
Our project is solely focused towards the processes that are employed when it
comes to the manufacturing of the components in any industry. The sequence that
has to be followed that leads to the transformation of raw material into a finished
product has been thoroughly outlined in our project coursework. A set of defined
operations that are performed at workstations for the purpose of converting raw material
into a finished product is termed as production process. The method of preparing
a detailed instructional guide for the manufacturing and assembly of components
into a completely finished product can be termed as ‘Process Planning’. The aim
of any industry is to utilize its machinery and equipment system in the most efficient
way possible which will yield the desired results. In order to achieve this, it is necessary
to plan the processes beforehand that will be needed to be carried out during
manufacturing i.e. Process Planning. |
en_US |
dc.language.iso |
en_US |
en_US |
dc.publisher |
AIKTC |
en_US |
dc.subject |
Project Report - ME |
en_US |
dc.title |
Process planning of aerospace components at Dabir industries |