Abstract:
This project work deals with the planning, scheduling and estimation of a (G+3) hostel building for
engineering college students. Engineering College located in city area. That is why we are proposing
all basic as well as modern amenities in hostel building which provides comfort, convenience to
students so that students should be able to concentrate more on studies. We are aiming to provide this
hostel building to students belongs to MIG & LIG. For achieving this & to reduce construction cost
& operation & maintenance cost, we are trying to make this building cost efficient & energy efficient.
Realizing the situation about huge energy & water consumption, we need to create energy & water
sources in premises of building itself so that occupants need not to depend upon external sources
which are not affordable.
For achieving more accuracy, we are using Civil engineering softwares like Auto CAD and Revit for
planning the building, Primavera P6 for scheduling & Microsoft excel for estimation purpose. We
had referred principles of planning and building byelaws which help us in proper grouping placing
various units of hostel building. Further Scheduling is to be done by using primavera P6. As we know
now a days building sector alone represents 35% energy consumption realizing the situation the need
is to adopt a sustainable green building approach, which is the ultimate solution to reduce the energy
demand of the building. Over usage of conventional material, not only harms the environment but
also affects the natural resources hence we are proposing to use natural cost effective materials and
some advanced techniques like rainwater harvesting and solar system to maintain the needs of
environment and economy.
Keywords: - PLANNING, ESTIMATION, SCHEDULING, ENERGY EFFICIENT