Productivity improvement using industrail engineering techniques

Show simple item record

dc.contributor.author Jamadar, Afaqahmed
dc.contributor.author Rajiwate, Afraz Giyasuddin (17DME136)
dc.contributor.author Mirza, Huzefa Muqaddar Baig (17DME129)
dc.contributor.author Momin, Mohd. Moiz Abdul Rauf (17DME131)
dc.contributor.author Kazi, Sami Zuber (17DME139)
dc.date.accessioned 2021-11-11T06:49:11Z
dc.date.available 2021-11-11T06:49:11Z
dc.date.issued 2020-05
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/3667
dc.description.abstract Productivity plays an important or major role in a company. There are many reasons for which the productivity decreases and there are various methods to improve productivity. But, choosing which method to use according to the situation is a wise decision. For this project work, thermocole manufacturing plant is considered and analyzed. After analysing the plant it was found that there was delay between tasks. The delay between the tasks affecting the production and causing low productivity rate. In order to improve productivity time study and motion study were found to be effective. Time study and motion study are the techniques of work study. Work study is known as highly effective productivity improvement method. Time study means to determine the standard time for doing an operation. Motion study means to simplify job and to develop more economical method of doing work. Determination of standard work cycle times is one of the important step used in work study, which provides critical inputs for improvement activities. After analysis and calculation of the time study and method study data it was found that there were no proper standards maintained and followed in the premises, the tasks were not evenly distributed between the workers, the space was not properly utilized, there were lack of safety measures, lack of performance standards, improper communication, unnecessary wastage of time. After successfully analyzing, proper time standards were considered in the industry which increased the production rate by 48 pieces extra per month in one machine. en_US
dc.language.iso en en_US
dc.publisher AIKTC en_US
dc.subject Project Report - ME en_US
dc.title Productivity improvement using industrail engineering techniques en_US
dc.type Project Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account