Three phase fault analysis with auto reset on temporary fault and permanent trip otherwise

Show simple item record

dc.contributor.author Syed, Kaleem
dc.contributor.author Shaikh, Mohammad Husen Iqbal (17EE20)
dc.contributor.author Mohammed Ejaz, Riyaz Ahmed (17EE23)
dc.contributor.author Ansari, Rehan Ahmed Mohammad (18DEE02)
dc.contributor.author Kasu, Mohmed Adil Yasin (18DEE07)
dc.date.accessioned 2021-11-20T06:09:13Z
dc.date.available 2021-11-20T06:09:13Z
dc.date.issued 2021-05
dc.identifier.uri http://localhost:8080/xmlui/handle/123456789/3743
dc.description.abstract This project develops an automatic tripping mechanism for the three phase supply system. The project output resets automatically after a brief interruption in the event temporary fault while it remains in tripped condition in case of permanent fault. The electrical substation which supply the power to the consumers, have failures due to some faults which can be temporary or permanent. These faults lead to substantial damage to the power system equipment. In India it is common, The faults might be LG (Line to Ground), LL (Line to Line), 3L (Three lines)in the supply systems and these faults in three phase supply system can affect the power system. To overcome this problem a system is built, which can sense these faults and automatically disconnects the supply to avoid large scale damage to the control gears in the grid sub-stations. This system is built using three single phase transformers which are wired in star input and star output, and 3 transformers are connected in delta connections, having input 220 volt and output at 12 volt. This concept low voltage testing of fault conditions is followed as it is not advisable to create on mains line. 555 timers are used for handling short duration and long duration fault conditions. A set of switches are used to create the LL, LG and 3L fault in low voltage side, for activating the tripping mechanism. Short duration fault returns the supply to the load immediately called as temporary trip while long duration shall result in permanent trip. The concept in the future can be extended to developing a mechanism to send message to the authorities via SMS by interfacing a GSM modem. en_US
dc.language.iso en en_US
dc.publisher AIKTC en_US
dc.subject Project Report - EE en_US
dc.title Three phase fault analysis with auto reset on temporary fault and permanent trip otherwise en_US
dc.type Project Report en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search Repository


Advanced Search

Browse

My Account