dc.contributor.author |
Parkar, Fauwaz |
|
dc.contributor.author |
Shaikh, Jahangir (15CES44) |
|
dc.contributor.author |
Bagwan, Saif Ali (15CES13) |
|
dc.date.accessioned |
2022-04-26T05:55:52Z |
|
dc.date.available |
2022-04-26T05:55:52Z |
|
dc.date.issued |
2020-05 |
|
dc.identifier.uri |
http://localhost:8080/xmlui/handle/123456789/3861 |
|
dc.description.abstract |
The proposed Net zero residential building is located at NASIK. The NZEB has G+3floor. The total land surface covered by the Net zero energy residential building is around 170 square meters. A complete design shall be done for the proposed NZEB using Indian standard codes. There are three main phases in a construction project which are planning, designing, modeling, quantity estimation and costing. The first stage in a project is planning, in which preparation of layout of plot has to be done. To conclude the project a detailed estimate of the residential building has also been prepared. |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
AIKTC |
en_US |
dc.subject |
Project Report - CE |
en_US |
dc.title |
Net zero energy building |
en_US |
dc.type |
Project Report |
en_US |